Transportation Improvement Program for FYs 2017-2020

#Reload the page Map

Program Summary

Draft TIP for Fiscal Years 2017 through 2020

$1,052,967,471.00 178
$749,394,593.00 9/21/2016
0 10/1/2016 through 9/30/2020
0 No amendments.
* Obligations during current TIP period only. Anna Emerson (615) 862-7157, emerson@nashvillempo.org

Project List

Search for projects by keyword:    

165 projects meet the search criteria:

TIP ID#Project NameImprovementLocationLead AgencyTotal Cost
2002-028Rockland Road WideningMRoad WideningSumner CountyHendersonville$12,624,690.00
2002-029Walton Ferry and Old Shackle Island Rd Improvements ProjectMIntersectionSumner CountyHendersonville$12,565,325.00
2004-005Jefferson Street IntersectionsMIntersectionDavidson CountyMetro Nashville$1,410,000.00
2004-051SR-247 (Duplex Road) WideningMRoad WideningMulti-CountyTDOT$18,040,000.00
2005-0065307 Urban Operating for Rover Public Transit - Relax & Ride ServiceMTransit OperationsRutherford CountyMurfreesboro Public Transit$940,000.00
2005-0075307 Urban Operating for Rover Public Transit - Mid-Cumberland Human Resource Agency (MCHRA) ContractMTransit OperationsRutherford CountyMurfreesboro Public Transit$520,000.00
2006-304Jefferson Springs Greenway ExtensionMGreenwayRutherford CountySmyrna$2,448,700.00
2006-408SR-6/ US-31/ Franklin RoadMRoad WideningWilliamson CountyTDOT$38,000,000.00
2008-11-027SR-255 Harding Place Extension (Phase 1)MNew RoadDavidson CountyMetro Nashville$11,370,000.00
2008-14-030Various intersection improvements (FAUB routes)MIntersectionDavidson CountyMetro Nashville$8,593,750.00
Show # of items:

List of Proposed Amendments

No proposed amendments available

Reports & Tables

Report Name Description
bullet Custom Project List Report Print or export a detailed list of all or selected projects
bullet Project Information Sheets Print or export detailed information about individual projects
bullet Funding Summary by Program Year and Grant Source View current balances of programmed funds by year and grant
Request another type of report Send us your request

List of Amendments

Amendment #TIP ID#ProjectActionMPO AdoptionTDOTFederal
2014-0012014-76-017Town Center TrailThis amendment combines Phases II and III of the project and adds $827,064 (federal) in CMAQ funds from a previous CMAQ award that was not programmed into the FYs 2014-2017 TIP prior to its adoption.3/19/20144/08/20144/25/2014
2014-0052014-66-053Nolensville Elementary SchoolThis amendment adds the project to the FY 2014-2017 TIP with $101,250 (federal)3/19/20144/08/20144/25/2014
2014-0062014-56-054Watt Hardison Elementary SchoolThis amendment adds the project to the FY 2014-2017 TIP with $208,166 (federal)3/19/20144/08/20144/25/2014
2014-0082014-85-055RTA OperationsThis amendment adds the project to the FY 2014-2017 TIP with $544,900 (federal) in FTA 5307 formula funds. The funds for this project were shifted from TIP # 2008-17-021.3/19/20143/28/20144/09/2014
2014-0112008-15-048Support vehicles, service vehicles, misc. support equipment, misc. shop equipment, operational softwareThis amendment adds $340,480 (federal) in FTA 5307 funds to FY 2014. The additional funds for this project are a combination of unobligated funds from FY 2013 and funds being shifted from TIP # 2008-15-046.3/19/20143/28/20144/09/2014
2014-0262011-16-119Goodlettsville Bicycle/Pedestrian Plan - Greenway ConnectorsThis is a new project for inclusion in the FYs 2014-2017 TIP. The project was included in the FYs 2011-2015 TIP, but was not carried forward to the current TIP. The amendment adds the project to the TIP with remaining CMAQ funds awarded to the City of Goodlettsville for the project. Per MAP-21 requirements, CMAQ funds have a share of 80% federal and 20% local, however through an agreement with TDOT, a portion of construction funds for the project are eligible for 100% federal share.9/17/2014  
2014-0282008-15-048Support vehicles, service vehicles, misc. support equipment, misc. shop equipment, operational softwareThis amendment adds $377,529 (federal share) in FTA 5309 funds to this project in FY 2014 from a 2010 TDOT allocation for support equipment.9/17/2014  
2014-0292014-85-023Music City Star Miscellaneous Support Equipment & Passenger AmenitiesThis amendment adds $54,182 (federal share) in FTA 5309 funds to this project in FY 2014 from a 2010 TDOT allocation for support equipment.9/17/2014  
2014-0302014-85-012Purchase and/or rehab Locomotive and rail carsThis amendment adds $2,401,787.00 (federal share) in FTA 5337 funds to TIP #2014-85-012 in FY 2014. These are new formula funds from the State of Good Repair Program apportioned in February 2014 to the Nashville-Davidson Urbanized Area. The State of Good Repair (SGR) program provides capital assistance for maintenance, rehabilitation, and replacement projects for existing fixed guideway and high intensity motorbus systems.9/17/2014  
2015-0012015-65-060Bus & Bus FacilitiesThis project was amended into the FY 2014-2017 TIP by resolution of the MPO Executive Board on 12/10/14. $65,000 (federal) in FTA 5339 funds were shifted from an existing MPO 5339 grouping (TIP #2014-85-028) to fund this project for the Franklin Transit Authority.12/10/2014  

List of Administrative Modifications

Adjustment #TIP ID#ProjectActionMPO Approval
2014-0022009-84-033I-40 Ramp ImprovementsProject adjusted to change the fiscal year for Construction from FY 2014 to FY 2015. There is no change to the programmed funding amounts and the total project cost remained the same. 1/09/2014
2014-0032014-110-044Donelson Pike (SR-255) RelocationProject adjusted to change the fiscal year for Design (PE-D) from FY 2014 to FY 2015. There is no change to the programmed funding amounts and the total project cost remained the same. 1/09/2014
2014-0082014-86-6666MPO Active Transportation ProgramMoved $200,000.00 (federal) and $50,000 (local) from existing 2014 U-STP line with "PE, ROW, CONSTRUCTION" type of work into a new 2014 U-STP line with an "IMPLEMENTATION" type of work. Set-aside funds are to be used for the hiring of the Metro Nashville Active Mobility Planner.3/14/2014
2014-0122008-15-048Support vehicles, service vehicles, misc. support equipment, misc. shop equipment, operational softwareThis project is being adjusted to add $85,120 (federal share) FTA 5307 funds in FY 2014. The additional funds for this project are a combination of unobligated funds from FY2013 MTA projects.4/25/2014
2015-0092012-44-172Sam Ridley Pkwy & Stonecrest Pkwy Intersection ImprovementsThis project is being adjusted to add $8,000 (federal) in M-STP funds for PE-D. Funding for PE-D was allocated to this project in the FY 2011-2015 TIP, however that funding was never obligated. Jurisdictions in the Murfreesboro UZA agreed to replace the funding that was left behind from the current balance of unprogrammed M-STP funds.2/11/2015
2015-0102015-66-063Nolensville Elementary School - Phase 2This project is being adjusted to correct the amount of PE-N funding available. Funding has been adjusted from $6,000 (federal) to $7,000 (federal) in SRTS funds.2/11/2015
2015-0122015-89-062TDOT Help Truck ExpansionThis project is being adjusted to break out an extra funding line to show funding amount intended for acquisition of capital for this project (purchase of additional trucks for program). This action was necessitated by FHWA as part of the Buy America partial waiver process. Overall project cost does not change.4/14/2015
2016-0062002-028Rockland Road WideningThis project was adjusted to shift $653,200 (federal) in FY16 U-STP funds to TIP# 2006-014 and $760,000 (federal) in FY16 U-STP funds to TIP# 2012-56-171.12/17/2015
2016-009AM-018SR-109This project has been adjusted to add $800,000 (federal) in FY16 NHPP funds for construction.1/27/2016
2016-0172008-64-037SR-106 (Hillsboro Rd ) and SR-46 Re-alignment/ Signalization.This project is being adjusted to shift $60,000 (federal) from the PE-D phase to the PE-N phase in order to cover an increase in PE-N costs due to necessary geotech work completed on the project.3/12/2016


Name the search:
OR

For example: "roadways 2016", "MPO construction projects"

Replace an existing search:

Updates the selected search with the current search criteria.

InfoYour saved searches are available on the My View tab.